C H A P T E R 1
Introduction
This document describes the installation procedure as advised by the
manufacturer. It is a result from our interpretation of many regulations and
laboratory practises. In addition, feedback from users and representatives
helped us to finalize this procedure.
All qualification checks have to be approved, or should be marked "n/a" if
not applicable. Any deviation observed must be documented in the 'non-
conformance' record. All relevant documents regarding system delivery an
installation qualification must be filed together in one location.
As regulations and customer requirements may change, manufacturer
reserves the right to introduces changes without prior notice. For details on
functionality, operation and theory reference is made to the instrument
users manual.